The suspended monorail pass-through system is the right choice for large, bulky steel constructions in combination with further systems.

 

These systems are especially suitable for steel constructions, which need to be processed on both sides as well as on the front surfaces, using the continuous flow procedure. Both sides of the blasting zone are equipped with several blast wheels, which are diagonally arranged. For the transportation of components, crane lifting units or Power & Free conveying systems can be used.   
 

Tunnelblast 10x25 with Power & Free conveyor system.

 
 
Tunnelblast 20x25 with synchronously moving lifting units